Kaláka

Deferred

Items deliberately left for later, each with the moment it is settled. When one is decided, its answer moves into the page it belongs to and its row is removed here.

Design decisions

Item Settle when
Participant phase tracker (core default phases, configurable, extensions add phases) designing the portal’s status page
Inline value syntax in mails building the mail editor
Registration flow when an account is involved (inline or before the form); minimum age for holding an account building the portal and registration UI
Retention of guest data and of the audit, including failed entries before the first production deployment (privacy policy)
The role set: which roles core ships and their capabilities before the admin UI
Which money plugins come first (the price ladder is needed for IVK) product scope with stakeholders, before the first season on Kaláka
The coupon-covered part of a WooCommerce order as a wallet ledger line designing the WooCommerce and wallet extensions
Where extensions register REST routes the first extension that needs one
Manual requeue of action mails that should have been sent after the first version
Year-to-year tracking add-on, built from preset links later
Public after-save actions for third parties when a third party needs them; at the earliest when alpha ends
Deprecation period for versioned extension points; the compatibility-check tool when the alpha phase ends
Spam protection; file upload building forms
Rate limit for self-sent mail building the portal
Post-camp settlement extension later
A view of the frozen submission later, low priority

UI text approved when built

Nothing reaches the UI without the owner’s approval. These texts and presentations are known to be needed and are approved when their UI is built: